What affects the cost of hiring an electrician in Australia?
We have not found a single official national price list for electrical work. This guide explains the factors that shape a quote and why most electrical work must be done by a licensed electrician.
Published 18 November 2026 · Sources checked 18 November 2026.
Why this guide does not publish a made-up hourly rate
Electrical work is licensed in every Australian state and territory, and the scope ranges from a safety switch or a new power point to a switchboard upgrade or a full rewire. Marketplace blogs publish very different hourly bands, and we could not verify a government or industry-body consumer price schedule that we were prepared to treat as a national average. Rather than invent a number or repeat an unverified range, this guide focuses on the factors that will appear in a real quote.
The Fair Work Ombudsman publishes modern awards that set minimum pay for employees in some industries. Those wage rates are not the same thing as a customer’s call-out fee, and we have not used them here as a stand-in for retail electrical prices.
What usually appears on an electrical quote
- A call-out or first-hour fee, plus labour after that, or a fixed price for a defined job.
- Materials: fittings, cable, a new switchboard, safety switches or smoke alarms.
- The complexity and risk of the job, including whether power needs to be isolated and whether work is in a roof space, underground or a tight switchboard.
- After-hours, weekend or emergency attendance, which is commonly dearer than a booked weekday visit.
- Certificates of electrical safety or compliance paperwork required in your state or territory.
- GST, and whether a follow-up visit is included if parts are on back-order.
Licence and safety checks
In Australia, most electrical installation and repair work must be carried out by a licensed electrician. Hiring an unlicensed person for that work can be illegal and can affect insurance. Ask for the licence number and check it with the regulator in your state or territory before work starts.
Get a written quote that describes the work, materials, GST and any certificate included. If two quotes differ widely, ask what each one has allowed for, rather than assuming the lower number is equivalent.
Sources
- Pay guides and modern awards — Fair Work Ombudsman, checked 18 November 2026
- Hiring a contractor — get quotes and check licences (state consumer guidance; similar regulators exist in other states and territories) — NSW Fair Trading, checked 18 November 2026